UNIVERSITY BLK.9 /WOLFCAMP/ UNIT Well Details
Texas Wells · Andrews County · UNIVERSITY BLOCK 9 (WOLFCAMP) field · XTO ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
UNIVERSITY BLK.9 /WOLFCAMP/ UNIT (API 00339573) is operated by XTO ENERGY INC. and sits in the UNIVERSITY BLOCK 9 (WOLFCAMP) oil & gas field of Andrews County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (117,246 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2015-04-02 | XTO Energy/ExxonMobil | — | 10,727 | 117,246 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2016-07-26 | Administrative re-save | XTO ENERGY INC. | UNIVERSITY BLOCK 9 (WOLFCAMP) | Producing / Vertical |
| 2016-07-09 |
New permit 2016-07-09 Completion 2015-05-18 |
XTO ENERGY INC. | UNIVERSITY BLOCK 9 (WOLFCAMP) | Producing / Vertical |
| 2015-04-01 | Administrative re-save | XTO ENERGY INC. | UNIVERSITY BLOCK 9 (WOLFCAMP) | Producing / Vertical |
| 2015-01-28 |
Initial filing Permit: 2015-01-28 Spud: 2005-06-17 Completion: 2014-11-14 |
XTO ENERGY INC. | UNIVERSITY BLOCK 9 (WOLFCAMP) | Producing / Vertical |