SCOTLAND WATERFLOOD UNIT Well Details
Texas Wells · Archer County · SCOTLAND (CADDO LIME) field · CHOLLA PETROLEUM, INC.
API No.
Latest Permit
Spud Date
Latest Completion
SCOTLAND WATERFLOOD UNIT (API 00942146) is operated by CHOLLA PETROLEUM, INC. and sits in the SCOTLAND (CADDO LIME) oil & gas field of Archer County, Texas.
Surface location: 33.6954, -98.5231
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (8,655 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2016-05-26 | Cholla Petroleum, Inc. | — | 5,807 | 8,655 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-06-26 | Administrative re-save | CHOLLA PETROLEUM, INC. | SCOTLAND (CADDO LIME) | Producing / Vertical |
| 2019-03-07 |
New permit 2019-03-07 Spudded 2010-04-01 Completion 2019-01-18 Field → SCOTLAND (CADDO LIME) |
CHOLLA PETROLEUM, INC. | SCOTLAND (CADDO LIME) | Producing / Vertical |
| 2011-06-28 |
Initial filing Permit: 2011-02-14 Completion: 2011-01-11 |
CHOLLA PETROLEUM, INC. | COLEMAN RANCH (ELLENBURGER) | Producing / Vertical |