ANDREWS LONGLEY Well Details
Texas Wells · Archer County · JEFFERSON, NE. (CADDO LIME) field · JMH PRODUCTION, LLC
API No.
Latest Permit
Spud Date
Latest Completion
ANDREWS LONGLEY (API 00943279) is operated by JMH PRODUCTION, LLC and sits in the JEFFERSON, NE. (CADDO LIME) oil & gas field of Archer County, Texas.
Surface location: 33.0000, -98.0000
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (133,671 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2025-07-10 | JMH Production, LLC | — | 5,094 | 105,924 | — |
| 2022-08-03 | JMH Production, LLC | — | 5,094 | 27,747 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-02-24 | Administrative re-save | JMH PRODUCTION, LLC | JEFFERSON, NE. (CADDO LIME) | Producing / Vertical |
| 2023-02-16 |
New permit 2023-02-16 Completion 2023-01-16 |
JMH PRODUCTION, LLC | JEFFERSON, NE. (CADDO LIME) | Producing / Vertical |
| 2023-01-17 | Administrative re-save | JMH PRODUCTION, LLC | JEFFERSON, NE. (CADDO LIME) | Producing / Vertical |
| 2022-10-10 |
Initial filing Permit: 2022-10-10 Spud: 2022-06-28 Completion: 2022-09-02 |
JMH PRODUCTION, LLC | JEFFERSON, NE. (CADDO LIME) | Producing / Vertical |