HAMILTON Well Details
Texas Wells · Brazos County · AGUILA VADO (EAGLEFORD) field · LAREDO ENERGY OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
HAMILTON (API 04132200) is operated by LAREDO ENERGY OPERATING, LLC and sits in the AGUILA VADO (EAGLEFORD) oil & gas field of Brazos County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (6,564,188 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2014-01-12
→ 2014-01-16 |
Laredo Energy | 5,394 | 7,910 | 6,564,188 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-08-20 | Administrative re-save | LAREDO ENERGY OPERATING, LLC | AGUILA VADO (EAGLEFORD) | Producing / Horizontal |
| 2015-03-06 |
New permit 2015-03-06 Completion 2014-04-30 Operator → LAREDO ENERGY OPERATING, LLC |
LAREDO ENERGY OPERATING, LLC | AGUILA VADO (EAGLEFORD) | Producing / Horizontal |
| 2014-08-26 |
Initial filing Permit: 2014-01-30 Spud: 2013-11-30 Completion: 2014-01-20 |
LAREDO ENERGY V, LP | AGUILA VADO (EAGLEFORD) | Producing / Horizontal |