HADDOX Well Details
Texas Wells · Burleson County · AGUILA VADO (EAGLEFORD) field · WILDFIRE ENERGY OPERATING LLC
API No.
Latest Permit
Spud Date
Latest Completion
HADDOX (API 05134362) is operated by WILDFIRE ENERGY OPERATING LLC and sits in the AGUILA VADO (EAGLEFORD) oil & gas field of Burleson County, Texas.
Surface location: 30.0000, -96.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (19,470,909 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2022-11-05
→ 2022-11-16 |
WildFire Energy Operating LLC | 7,473 | 8,553 | 19,470,909 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-03-13 | Administrative re-save | WILDFIRE ENERGY OPERATING LLC | AGUILA VADO (EAGLEFORD) | Producing / Horizontal |
| 2023-01-18 |
New permit 2023-01-18 Spudded 2022-07-01 Completion 2022-12-01 Type → Producing |
WILDFIRE ENERGY OPERATING LLC | AGUILA VADO (EAGLEFORD) | Producing / Horizontal |
| 2022-11-17 | Administrative re-save | WILDFIRE ENERGY OPERATING LLC | AGUILA VADO (EAGLEFORD) | Shut-In Producer / Horizontal |
| 2022-10-27 |
Initial filing Permit: 2022-10-27 Spud: 2022-06-30 Completion: 2022-08-24 |
WILDFIRE ENERGY OPERATING LLC | AGUILA VADO (EAGLEFORD) | Shut-In Producer / Horizontal |