TEMPLETON-GOODSON (AW) Well Details
Texas Wells · Cass County · HIDDEN ROCK (COTTON VALLEY LIME) field · BARROW-SHAVER RESOURCES CO.
API No.
Latest Permit
Spud Date
Latest Completion
TEMPLETON-GOODSON (AW) (API 06730875) is operated by BARROW-SHAVER RESOURCES CO. and sits in the HIDDEN ROCK (COTTON VALLEY LIME) oil & gas field of Cass County, Texas.
Surface location: 32.9599, -94.5317
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (12,171,993 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-07-24
→ 2023-07-30 |
BARROW-SHAVER RESOURCES CO. | 7,026 | 11,115 | 12,171,993 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-04-02 | Administrative re-save | BARROW-SHAVER RESOURCES CO. | HIDDEN ROCK (COTTON VALLEY LIME) | Producing / Horizontal |
| 2023-11-10 |
Initial filing Permit: 2023-11-10 Spud: 2023-06-16 Completion: 2023-08-03 |
BARROW-SHAVER RESOURCES CO. | HIDDEN ROCK (COTTON VALLEY LIME) | Producing / Horizontal |