J.L. BRUNSON B Well Details
Texas Wells · Coke County · NDUGU (CROSS-CUT) field · BOAZ ENERGY II OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
J.L. BRUNSON B (API 08132014) is operated by BOAZ ENERGY II OPERATING, LLC and sits in the NDUGU (CROSS-CUT) oil & gas field of Coke County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (20,496 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2012-12-08 | Boaz Energy, LLC. | — | 5,672 | 20,496 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-07-31 | Administrative re-save | BOAZ ENERGY II OPERATING, LLC | NDUGU (CROSS-CUT) | Active UIC / Vertical |
| 2017-07-26 |
New permit 2017-07-26 Spudded 2012-11-21 Completion 2017-06-01 Type → Active UIC Operator → BOAZ ENERGY II OPERATING, LLC |
BOAZ ENERGY II OPERATING, LLC | NDUGU (CROSS-CUT) | Active UIC / Vertical |
| 2014-03-12 |
Initial filing Permit: 2013-01-16 Completion: 2012-12-01 |
BOAZ ENERGY, LLC | NDUGU (CROSS-CUT) | Producing / Vertical |