UNIVERSITY 45 Well Details
Texas Wells · Crockett County · LIN (WOLFCAMP) field · EP ENERGY E&P COMPANY, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
UNIVERSITY 45 (API 10541478) is operated by EP ENERGY E&P COMPANY, L.P. and sits in the LIN (WOLFCAMP) oil & gas field of Crockett County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (6,410,326 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2014-08-17
→ 2014-08-29 |
EP Energy | 8,375 | 6,635 | 6,410,326 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-01-27 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2014-10-08 |
New permit 2014-10-08 Spudded 2012-07-03 Completion 2014-09-05 Type → Producing Operator → EP ENERGY E&P COMPANY, L.P. |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2014-05-29 |
Initial filing Permit: 2013-03-11 Completion: 2012-09-02 |
PETROHAWK OPERATING COMPANY | LIN (WOLFCAMP) | Shut-In Producer / Horizontal |