UNIVERSITY EAST Well Details
Texas Wells · Crockett County · LIN (WOLFCAMP) field · EP ENERGY E&P COMPANY, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
UNIVERSITY EAST (API 10541628) is operated by EP ENERGY E&P COMPANY, L.P. and sits in the LIN (WOLFCAMP) oil & gas field of Crockett County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (8,535,954 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2013-05-12
→ 2013-05-16 |
EP Energy | 8,386 | 6,739 | 8,535,954 | — |
Update History (5 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-05-06 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2020-03-26 |
New permit 2020-03-26 Completion 2020-01-24 |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2019-04-22 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2018-08-24 |
New permit 2018-08-24 Spudded 2012-01-12 Completion 2016-01-11 |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2013-10-30 |
Initial filing Permit: 2013-08-01 Completion: 2013-06-14 |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |