UNIVERSITY LANDS 225 Well Details
Texas Wells · Crockett County · LIN (WOLFCAMP) field · TRIPLE CROWN RESOURCES, LLC
API No.
Latest Permit
Spud Date
Latest Completion
UNIVERSITY LANDS 225 (API 10542530) is operated by TRIPLE CROWN RESOURCES, LLC and sits in the LIN (WOLFCAMP) oil & gas field of Crockett County, Texas.
Surface location: 30.9983, -101.1218
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (19,823,412 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-02-11
→ 2023-02-28 |
Triple Crown Resources | 10,789 | 6,186 | 19,823,412 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-01-22 |
New permit 2023-09-18 |
TRIPLE CROWN RESOURCES, LLC | LIN (WOLFCAMP) | Producing / Horizontal |
| 2024-01-17 |
New permit 2023-08-29 |
TRIPLE CROWN RESOURCES, LLC | LIN (WOLFCAMP) | Producing / Horizontal |
| 2023-09-18 |
New permit 2023-09-18 |
TRIPLE CROWN RESOURCES, LLC | LIN (WOLFCAMP) | Producing / Horizontal |
| 2023-08-29 |
Initial filing Permit: 2023-08-29 Spud: 2022-12-23 Completion: 2023-04-07 |
TRIPLE CROWN RESOURCES, LLC | LIN (WOLFCAMP) | Producing / Horizontal |