UNIVERSITY LANDS 226 Well Details
Texas Wells · Crockett County · LIN (WOLFCAMP) field · TRIPLE CROWN RESOURCES, LLC
Latest Permit
Spud Date
Latest Completion
UNIVERSITY LANDS 226 (API 10542558) is operated by TRIPLE CROWN RESOURCES, LLC and sits in the LIN (WOLFCAMP) oil & gas field of Crockett County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (30,885,456 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2025-09-29
→ 2025-10-24 |
Triple Crown Resources | 16,086 | 6,530 | 30,885,456 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-03-12 | Administrative re-save | TRIPLE CROWN RESOURCES, LLC | LIN (WOLFCAMP) | Producing / Horizontal |
| 2026-02-16 |
New permit 2026-02-16 Completion 2025-11-10 Type → Producing |
TRIPLE CROWN RESOURCES, LLC | LIN (WOLFCAMP) | Producing / Horizontal |
| 2025-09-30 | Administrative re-save | TRIPLE CROWN RESOURCES, LLC | LIN (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2025-09-15 |
Initial filing Permit: 2025-09-15 Spud: 2025-03-21 Completion: 2025-06-04 |
TRIPLE CROWN RESOURCES, LLC | LIN (WOLFCAMP) | Shut-In Producer / Horizontal |