PHIL Well Details
Texas Wells · Crosby County · HOOPLE (CLEAR FORK) field · CUSTER & WRIGHT OPERATING, INC.
API No.
Latest Permit
Spud Date
Latest Completion
PHIL (API 10732093) is operated by CUSTER & WRIGHT OPERATING, INC. and sits in the HOOPLE (CLEAR FORK) oil & gas field of Crosby County, Texas.
Surface location: 33.0000, -101.0000
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (45,104 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2017-09-07 | Custer & Wright Operating, Inc | — | 4,000 | 12,916 | — |
| 2016-10-25 | Custer & Wright Operating, Inc | — | 4,109 | 32,188 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-12-19 | Administrative re-save | CUSTER & WRIGHT OPERATING, INC. | HOOPLE (CLEAR FORK) | Active UIC / Vertical |
| 2017-10-19 |
New permit 2017-10-19 Completion 2017-10-12 Type → Active UIC |
CUSTER & WRIGHT OPERATING, INC. | HOOPLE (CLEAR FORK) | Active UIC / Vertical |
| 2016-12-14 | Administrative re-save | CUSTER & WRIGHT OPERATING, INC. | HOOPLE (CLEAR FORK) | Producing / Vertical |
| 2016-11-16 |
Initial filing Permit: 2016-11-16 Spud: 2016-10-08 Completion: 2016-11-11 |
CUSTER & WRIGHT OPERATING, INC. | HOOPLE (CLEAR FORK) | Producing / Vertical |