GEORGETTE STATE Well Details
Texas Wells · Culberson County · FORD, WEST (WOLFCAMP) field · CAPITAN ENERGY, INCORPORATED
API No.
Latest Permit
Spud Date
Latest Completion
GEORGETTE STATE (API 10932700) is operated by CAPITAN ENERGY, INCORPORATED and sits in the FORD, WEST (WOLFCAMP) oil & gas field of Culberson County, Texas.
Surface location: 31.0000, -104.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (25,821,618 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2014-12-07
→ 2014-12-16 |
Capitan Energy INC | 9,823 | 8,310 | 25,821,618 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2021-01-04 | Administrative re-save | CAPITAN ENERGY, INCORPORATED | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2020-12-16 |
New permit 2020-12-16 |
CAPITAN ENERGY, INCORPORATED | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2019-09-10 | Administrative re-save | CAPITAN ENERGY, INCORPORATED | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2019-05-14 |
New permit 2019-05-14 |
CAPITAN ENERGY, INCORPORATED | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2015-08-13 | Administrative re-save | CAPITAN ENERGY, INCORPORATED | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2015-04-14 |
Initial filing Permit: 2015-04-14 Spud: 2014-06-06 Completion: 2015-01-11 |
CAPITAN ENERGY, INCORPORATED | FORD, WEST (WOLFCAMP) | Producing / Horizontal |