HAY DENISE STATE 08/05 Well Details
Texas Wells · Culberson County · SANDBAR (BONE SPRING) field · CHEVRON U. S. A. INC.
API No.
Latest Permit
Spud Date
Latest Completion
HAY DENISE STATE 08/05 (API 10933606) is operated by CHEVRON U. S. A. INC. and sits in the SANDBAR (BONE SPRING) oil & gas field of Culberson County, Texas.
Surface location: 31.8527, -104.0828
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (21,066,318 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2021-12-12
→ 2021-12-27 |
Chevron USA Inc. | 10,965 | 9,114 | 21,066,318 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-04-18 | Administrative re-save | CHEVRON U. S. A. INC. | SANDBAR (BONE SPRING) | Producing / Horizontal |
| 2023-02-28 |
New permit 2023-02-28 Completion 2022-02-17 |
CHEVRON U. S. A. INC. | SANDBAR (BONE SPRING) | Producing / Horizontal |
| 2022-11-09 |
New permit 2022-08-02 Completion 2022-01-30 Type → Producing |
CHEVRON U. S. A. INC. | SANDBAR (BONE SPRING) | Producing / Horizontal |
| 2022-08-11 |
New permit 2022-05-13 Spudded 2020-02-01 Completion 2020-04-05 Type → Shut-In Producer |
CHEVRON U. S. A. INC. | SANDBAR (BONE SPRING) | Shut-In Producer / Horizontal |
| 2022-08-02 |
New permit 2022-08-02 Spudded 2022-02-01 Completion 2022-05-10 Type → Producing |
CHEVRON U. S. A. INC. | SANDBAR (BONE SPRING) | Producing / Horizontal |
| 2022-05-13 |
Initial filing Permit: 2022-05-13 Spud: 2020-02-01 Completion: 2020-04-05 |
CHEVRON U. S. A. INC. | SANDBAR (BONE SPRING) | Shut-In Producer / Horizontal |