PREWIT-BARBARO 23 C FEE Well Details
Texas Wells · Culberson County · FORD, WEST (WOLFCAMP) field · CIMAREX ENERGY CO.
API No.
Latest Permit
Spud Date
Latest Completion
PREWIT-BARBARO 23 C FEE (API 10933924) is operated by CIMAREX ENERGY CO. and sits in the FORD, WEST (WOLFCAMP) oil & gas field of Culberson County, Texas.
Surface location: 31.9556, -104.1398
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (26,529,852 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-10-06
→ 2023-10-25 |
Cimarex Energy Co. | 10,978 | 9,224 | 26,529,852 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-09-30 | Administrative re-save | CIMAREX ENERGY CO. | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2024-07-09 |
New permit 2024-07-09 Completion 2023-11-09 Type → Producing |
CIMAREX ENERGY CO. | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2023-06-22 | Administrative re-save | CIMAREX ENERGY CO. | FORD, WEST (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2023-05-02 |
Initial filing Permit: 2023-05-02 Spud: 2022-11-25 Completion: 2023-01-24 |
CIMAREX ENERGY CO. | FORD, WEST (WOLFCAMP) | Shut-In Producer / Horizontal |