TYSON FEE 44 Well Details
Texas Wells · Culberson County · FORD, WEST (WOLFCAMP) field · CAPITAN ENERGY, INCORPORATED
API No.
Latest Permit
Spud Date
Latest Completion
TYSON FEE 44 (API 10933995) is operated by CAPITAN ENERGY, INCORPORATED and sits in the FORD, WEST (WOLFCAMP) oil & gas field of Culberson County, Texas.
Surface location: 31.0000, -104.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (15,083,654 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-10-04
→ 2023-10-12 |
Capitan Energy INC | 5,544 | 9,256 | 15,083,655 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-04-19 | Administrative re-save | CAPITAN ENERGY, INCORPORATED | FORD, WEST (WOLFCAMP) | Producing / Horizontal |
| 2024-02-05 |
Initial filing Permit: 2024-02-05 Spud: 2023-03-06 Completion: 2023-10-27 |
CAPITAN ENERGY, INCORPORATED | FORD, WEST (WOLFCAMP) | Producing / Horizontal |