ULRICH B Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
ULRICH B (API 12332402) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (4,692,934 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-12-14
→ 2017-12-16 |
Devon Energy Production Company L. P. | 6,784 | 12,584 | 4,692,934 | — |
| 2011-05-09 | BHP Billiton Petroleum | 6,784 | — | — | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-06-10 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2026-06-03 |
New permit 2026-06-03 Completion 2026-05-30 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2026-04-07 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2026-03-18 |
New permit 2026-03-18 Spudded 2011-03-10 Completion 2023-02-23 Operator → DEVON ENERGY PRODUCTION CO, L.P. |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2012-08-23 |
New permit 2012-06-20 Field → EAGLEVILLE (EAGLE FORD-2) |
GEOSOUTHERN ENERGY CORPORATION | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2012-05-21 |
Initial filing Permit: 2011-07-22 Completion: 2011-05-24 |
GEOSOUTHERN ENERGY CORPORATION | DE WITT (EAGLE FORD SHALE) | Producing / Horizontal |