ELDER B Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
ELDER B (API 12333022) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (5,452,021 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2013-08-15
→ 2013-08-21 |
BHP Billiton Petroleum | 4,164 | 12,481 | 2,759,456 | — |
|
2013-08-15
→ 2013-08-21 |
BHP Billiton Petroleum | 4,164 | 12,481 | 2,692,565 | — |
Update History (5 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-03-19 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2026-03-16 |
New permit 2026-03-16 Spudded 2013-05-15 Completion 2025-04-25 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2014-10-10 |
New permit 2014-07-23 Spudded 2014-07-16 Completion 2014-07-19 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2014-09-29 |
New permit 2014-07-15 Spudded 2012-12-29 Completion 2013-12-10 Type → Producing Operator → DEVON ENERGY PRODUCTION CO, L.P. |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2014-02-11 |
Initial filing Permit: 2013-12-18 Completion: 2013-12-08 |
GEOSOUTHERN ENERGY CORPORATION | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |