STULGIS A Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
STULGIS A (API 12333087) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (6,070,300 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2013-09-20
→ 2013-10-24 |
BHP Billiton Petroleum | 4,445 | 12,434 | 2,962,019 | — |
|
2013-09-20
→ 2013-10-24 |
BHP Billiton Petroleum | 4,445 | 12,708 | 3,108,281 | — |
Update History (7 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-10-22 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2025-10-14 |
New permit 2025-10-14 Completion 2025-09-28 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2019-10-11 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2019-06-24 |
New permit 2019-06-24 Completion 2019-02-13 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2015-12-10 |
Spudded 2013-04-10 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2015-03-26 |
New permit 2015-03-26 Spudded 2014-10-28 Completion 2014-11-04 Operator → DEVON ENERGY PRODUCTION CO, L.P. |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2014-04-16 |
Initial filing Permit: 2014-02-03 Spud: 2013-04-10 Completion: 2013-12-23 |
GEOSOUTHERN ENERGY CORPORATION | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |