BLACKWELL A Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
BLACKWELL A (API 12333092) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (4,733,585 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2014-03-08
→ 2014-03-14 |
BHP Billiton Petroleum | 5,601 | 13,482 | 4,733,585 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-03-30 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2017-03-14 |
New permit 2017-03-14 Spudded 2013-09-17 Completion 2014-06-15 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2016-07-26 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2016-07-14 |
New permit 2016-07-14 Spudded 2013-09-07 Completion 2015-06-06 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2014-09-04 |
New permit 2014-08-07 Completion 2014-06-15 Type → Producing |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2014-05-29 |
Initial filing Permit: 2014-04-15 Spud: 2013-09-17 Completion: 2013-11-05 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |