E. BUTLER A Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
E. BUTLER A (API 12333537) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
FracFocus Records 4 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (26,138,780 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-12-06
→ 2019-12-11 |
Devon Energy Production Company L. P. | 6,285 | 13,390 | 4,668,174 | — |
|
2019-10-19
→ 2019-10-23 |
BPX Operating Company | 6,285 | 13,281 | 2,793,672 | — |
|
2019-10-19
→ 2019-10-30 |
BPX Operating Company | 6,285 | 13,370 | 11,503,170 | — |
|
2014-10-16
→ 2014-10-28 |
BHP Billiton Petroleum | 6,285 | 19,595 | 7,173,764 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-03-27 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2020-02-06 |
New permit 2020-02-06 Completion 2020-01-05 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2015-12-08 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2015-03-24 |
Initial filing Permit: 2015-03-24 Spud: 2014-06-08 Completion: 2015-01-22 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |