OLIVER A Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
OLIVER A (API 12333594) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (4,870,756 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2014-12-04
→ 2014-12-11 |
BHP Billiton Petroleum | 5,356 | 12,666 | 4,870,756 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-09-22 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2025-09-17 |
New permit 2025-09-17 Spudded 2014-08-29 Completion 2025-08-21 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2015-12-21 |
New permit 2015-06-02 Completion 2015-02-25 Type → Producing |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2015-08-19 |
New permit 2015-01-13 Completion 2014-09-14 Type → Shut-In Producer |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |
| 2015-06-02 |
New permit 2015-06-02 Completion 2015-02-25 Type → Producing |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2015-01-13 |
Initial filing Permit: 2015-01-13 Spud: 2014-08-28 Completion: 2014-09-14 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |