OLIVER D-HANSEN B SA Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
OLIVER D-HANSEN B SA (API 12334036) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (5,325,048 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-12-02
→ 2015-12-29 |
BHP Billiton Petroleum | 6,094 | 12,574 | 5,325,048 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2016-10-20 |
New permit 2016-06-08 Completion 2016-05-24 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2016-10-19 |
New permit 2016-05-09 Spudded 2015-03-29 Completion 2016-02-15 Type → Producing Operator → DEVON ENERGY PRODUCTION CO, L.P. |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2016-08-15 |
New permit 2015-11-10 Spudded 2015-04-02 Completion 2015-08-07 Type → Shut-In Producer Operator → BHP BILLITON PET(TXLA OP) CO |
BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |
| 2016-06-08 |
New permit 2016-06-08 Completion 2016-05-24 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2016-05-09 |
New permit 2016-05-09 Completion 2016-02-15 Type → Producing Operator → DEVON ENERGY PRODUCTION CO, L.P. |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2015-11-10 |
Initial filing Permit: 2015-11-10 Spud: 2015-03-29 Completion: 2015-08-07 |
BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |