H SISTERS B Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
H SISTERS B (API 12334284) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (5,346,312 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-04-14
→ 2017-05-05 |
BHP Billiton Petroleum | 5,845 | 13,498 | 5,346,312 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2018-06-19 |
New permit 2018-05-21 Completion 2018-02-19 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2018-06-06 |
New permit 2017-11-02 Completion 2017-07-11 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2018-05-21 |
New permit 2018-05-21 Completion 2018-02-19 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2017-11-02 |
New permit 2017-11-02 Completion 2017-07-11 Type → Producing Operator → DEVON ENERGY PRODUCTION CO, L.P. |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2017-04-11 | Administrative re-save | BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |
| 2017-03-03 |
Initial filing Permit: 2017-03-03 Spud: 2016-11-11 Completion: 2017-01-30 |
BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |