MUIR F Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
MUIR F (API 12334408) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (15,843,809 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-12-12
→ 2017-12-30 |
BHP Billiton Petroleum | 6,051 | 12,769 | 15,843,809 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-05-03 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2019-04-01 |
New permit 2019-04-01 Completion 2018-10-01 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2018-07-19 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2018-05-14 |
New permit 2018-05-14 Completion 2018-03-22 Type → Producing Operator → DEVON ENERGY PRODUCTION CO, L.P. |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2018-05-02 | Administrative re-save | BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |
| 2017-11-30 |
Initial filing Permit: 2017-11-30 Spud: 2017-08-19 Completion: 2017-09-14 |
BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |