SEIDEL UNIT A Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-2) field · BURLINGTON RESOURCES O & G CO LP
API No.
Latest Permit
Spud Date
Latest Completion
SEIDEL UNIT A (API 12334628) is operated by BURLINGTON RESOURCES O & G CO LP and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of DeWitt County, Texas.
Surface location: 29.0000, -97.0000
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (25,361,402 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2022-11-13
→ 2022-11-22 |
ConocoPhillips Company/Burlington Resources | 6,396 | 12,985 | 13,305,450 | — |
|
2018-12-09
→ 2018-12-29 |
ConocoPhillips Company/Burlington Resources | 6,396 | 12,995 | 12,055,952 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-08-19 | Administrative re-save | BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2025-08-14 |
New permit 2025-08-14 Completion 2022-09-18 |
BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2020-11-06 | Administrative re-save | BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2020-11-02 |
New permit 2020-11-02 Completion 2019-03-05 Type → Producing |
BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2019-02-07 | Administrative re-save | BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |
| 2019-01-09 |
Initial filing Permit: 2019-01-09 Spud: 2018-07-28 Completion: 2018-08-16 |
BURLINGTON RESOURCES O & G CO LP | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |