PARKER MINERALS 8 Well Details
Texas Wells · Ector County · GOLDSMITH field · not found
API No.
Latest Permit
Spud Date
Latest Completion
PARKER MINERALS 8 (API 13543527) is operated by not found and sits in the GOLDSMITH oil & gas field of Ector County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (1,617,000 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-11-21
→ 2017-11-28 |
Sheridan Production Company, LLC | 5,224 | 4,414 | 1,617,000 | — |
Update History (10 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-09-23 | Administrative re-save | not found | GOLDSMITH | Producing / Horizontal |
| 2024-06-25 |
New permit 2024-06-25 Completion 2024-05-31 |
not found | GOLDSMITH | Producing / Horizontal |
| 2024-03-11 | Administrative re-save | not found | GOLDSMITH | Producing / Horizontal |
| 2023-11-21 |
New permit 2023-11-21 Completion 2023-10-20 |
not found | GOLDSMITH | Producing / Horizontal |
| 2023-03-21 | Administrative re-save | not found | GOLDSMITH | Producing / Horizontal |
| 2023-01-11 |
New permit 2023-01-11 Completion 2022-12-08 |
not found | GOLDSMITH | Producing / Horizontal |
| 2022-08-02 | Administrative re-save | not found | GOLDSMITH | Producing / Horizontal |
| 2022-05-11 |
New permit 2022-05-11 Completion 2022-04-13 Operator → not found |
not found | GOLDSMITH | Producing / Horizontal |
| 2018-03-14 | Administrative re-save | SHERIDAN PRODUCTION COMPANY, LLC | GOLDSMITH | Producing / Horizontal |
| 2018-01-24 |
Initial filing Permit: 2018-01-24 Spud: 2017-09-29 Completion: 2017-12-11 |
SHERIDAN PRODUCTION COMPANY, LLC | GOLDSMITH | Producing / Horizontal |