PARKER MINERALS 8A Well Details
Texas Wells · Ector County · GOLDSMITH field · not found
API No.
Latest Permit
Spud Date
Latest Completion
PARKER MINERALS 8A (API 13543561) is operated by not found and sits in the GOLDSMITH oil & gas field of Ector County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (1,799,108 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-03-23
→ 2018-03-29 |
Sheridan Production Company, LLC | 6,608 | 4,400 | 1,799,108 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-12-13 | Administrative re-save | not found | GOLDSMITH | Producing / Horizontal |
| 2024-10-03 |
New permit 2024-10-03 Completion 2024-08-22 |
not found | GOLDSMITH | Producing / Horizontal |
| 2023-08-10 | Administrative re-save | not found | GOLDSMITH | Producing / Horizontal |
| 2023-07-11 |
New permit 2023-07-11 Completion 2023-06-08 Operator → not found |
not found | GOLDSMITH | Producing / Horizontal |
| 2018-07-20 | Administrative re-save | SHERIDAN PRODUCTION COMPANY, LLC | GOLDSMITH | Producing / Horizontal |
| 2018-05-11 |
Initial filing Permit: 2018-05-11 Spud: 2018-01-17 Completion: 2018-04-10 |
SHERIDAN PRODUCTION COMPANY, LLC | GOLDSMITH | Producing / Horizontal |