CONNELL ESTATE C Well Details
Texas Wells · Ector County · PENWELL (CLEAR FORK) field · CROSS TIMBERS ENERGY, LLC
API No.
Latest Permit
Spud Date
Latest Completion
CONNELL ESTATE C (API 13543786) is operated by CROSS TIMBERS ENERGY, LLC and sits in the PENWELL (CLEAR FORK) oil & gas field of Ector County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (159,885 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2022-08-29 | Cross Timbers Energy, LLC | — | 5,005 | 109,497 | — |
| 2022-06-20 | Cross Timbers Energy, LLC | — | 5,554 | 50,388 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-03-28 | Administrative re-save | CROSS TIMBERS ENERGY, LLC | PENWELL (CLEAR FORK) | Producing / Vertical |
| 2022-12-15 |
New permit 2022-12-15 Completion 2022-07-25 Field → PENWELL (CLEAR FORK) |
CROSS TIMBERS ENERGY, LLC | PENWELL (CLEAR FORK) | Producing / Vertical |
| 2021-09-22 | Administrative re-save | CROSS TIMBERS ENERGY, LLC | JORDAN, S. (DEVONIAN) | Producing / Vertical |
| 2021-09-16 |
New permit 2021-09-16 Completion 2021-09-03 |
CROSS TIMBERS ENERGY, LLC | JORDAN, S. (DEVONIAN) | Producing / Vertical |
| 2021-07-06 | Field → JORDAN, S. (DEVONIAN) | CROSS TIMBERS ENERGY, LLC | JORDAN, S. (DEVONIAN) | Producing / Vertical |
| 2021-06-07 |
Initial filing Permit: 2021-06-07 Spud: 2021-02-01 Completion: 2021-03-20 |
CROSS TIMBERS ENERGY, LLC | JORDAN (FUSSELMAN) | Producing / Vertical |