HORTON Well Details
Texas Wells · Freestone County · RED LAKE (RODESSA 8300) field · STROUD PETROLEUM, INC.
API No.
Latest Permit
Spud Date
Latest Completion
HORTON (API 16132660) is operated by STROUD PETROLEUM, INC. and sits in the RED LAKE (RODESSA 8300) oil & gas field of Freestone County, Texas.
Surface location: 31.7207, -96.0556
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (153,839 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2017-02-24 | Stroud Petroleum, Inc. | — | 8,210 | 153,839 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-07-31 | Field → RED LAKE (RODESSA 8300) | STROUD PETROLEUM, INC. | RED LAKE (RODESSA 8300) | Producing / Vertical |
| 2016-10-26 |
Initial filing Permit: 2016-10-26 Spud: 2003-07-02 Completion: 2016-09-17 |
STROUD PETROLEUM, INC. | NAN-SU-GAIL (CV CONSOLIDATED) | Producing / Vertical |