SPEAR POINT 1H Well Details
Texas Wells · Frio County · BRISCOE RANCH (EAGLEFORD) field · CABOT OIL & GAS CORPORATION
API No.
Latest Permit
Spud Date
Latest Completion
SPEAR POINT 1H (API 16333980) is operated by CABOT OIL & GAS CORPORATION and sits in the BRISCOE RANCH (EAGLEFORD) oil & gas field of Frio County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (12,274,770 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2016-05-03
→ 2016-05-18 |
Cabot Oil & Gas Corp | 10,791 | 7,769 | 12,274,771 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2016-06-09 | Administrative re-save | CABOT OIL & GAS CORPORATION | BRISCOE RANCH (EAGLEFORD) | Producing / Horizontal |
| 2016-06-06 |
Initial filing Permit: 2016-06-06 Spud: 2016-01-26 Completion: 2016-05-23 |
CABOT OIL & GAS CORPORATION | BRISCOE RANCH (EAGLEFORD) | Producing / Horizontal |