ADAIR SAN ANDRES UNIT Well Details
Texas Wells · Gaines County · ADAIR field · HILCORP ENERGY COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
ADAIR SAN ANDRES UNIT (API 16535299) is operated by HILCORP ENERGY COMPANY and sits in the ADAIR oil & gas field of Gaines County, Texas.
Update History (7 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-10-06 | Administrative re-save | HILCORP ENERGY COMPANY | ADAIR | Producing / Vertical |
| 2025-08-01 |
New permit 2025-08-01 Completion 2025-07-01 Operator → HILCORP ENERGY COMPANY |
HILCORP ENERGY COMPANY | ADAIR | Producing / Vertical |
| 2015-11-18 | Administrative re-save | APACHE CORPORATION | ADAIR | Producing / Vertical |
| 2015-11-10 |
New permit 2015-11-10 Completion 2015-10-15 Field → ADAIR |
APACHE CORPORATION | ADAIR | Producing / Vertical |
| 2015-03-27 | Administrative re-save | APACHE CORPORATION | ADAIR, S. (WOLFCAMP) | Producing / Vertical |
| 2015-03-24 |
New permit 2015-03-24 Spudded 1997-11-15 Completion 2015-02-03 |
APACHE CORPORATION | ADAIR, S. (WOLFCAMP) | Producing / Vertical |
| 2011-07-14 |
Initial filing Permit: 2011-04-08 Completion: 2011-03-18 |
APACHE CORPORATION | ADAIR, S. (WOLFCAMP) | Producing / Vertical |