THOMPSON B Well Details
Texas Wells · Gaines County · CARM-ANN (SAN ANDRES) field · PARALLEL PETROLEUM LLC
API No.
Latest Permit
Spud Date
Latest Completion
THOMPSON B (API 16537766) is operated by PARALLEL PETROLEUM LLC and sits in the CARM-ANN (SAN ANDRES) oil & gas field of Gaines County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (8,772 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2013-05-16 | Parallel Petroleum LLC | — | 5,083 | 8,772 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-09-08 | Administrative re-save | PARALLEL PETROLEUM LLC | CARM-ANN (SAN ANDRES) | Active UIC / Vertical |
| 2015-09-03 |
New permit 2015-09-03 Spudded 2013-04-27 Completion 2015-08-13 Type → Active UIC |
PARALLEL PETROLEUM LLC | CARM-ANN (SAN ANDRES) | Active UIC / Vertical |
| 2014-03-26 |
Initial filing Permit: 2013-07-11 Completion: 2013-05-23 |
PARALLEL PETROLEUM LLC | CARM-ANN (SAN ANDRES) | Producing / Vertical |