SOUR LAKE 405 Well Details
Texas Wells · Gaines County · HARRIS (SAN ANDRES) field · SABINAL ENERGY OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
SOUR LAKE 405 (API 16538722) is operated by SABINAL ENERGY OPERATING, LLC and sits in the HARRIS (SAN ANDRES) oil & gas field of Gaines County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (2,482,483 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-08-31
→ 2018-09-02 |
Sabinal Energy | 9,525 | 4,634 | 2,482,483 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-05-04 |
Completion 2018-09-13 |
SABINAL ENERGY OPERATING, LLC | HARRIS (SAN ANDRES) | Shut-In Producer / Horizontal |
| 2023-04-06 |
New permit 2023-04-06 Completion 2023-04-01 |
SABINAL ENERGY OPERATING, LLC | HARRIS (SAN ANDRES) | Shut-In Producer / Horizontal |
| 2019-09-20 |
New permit 2018-10-31 Completion 2018-08-01 Type → Shut-In Producer |
SABINAL ENERGY OPERATING, LLC | HARRIS (SAN ANDRES) | Shut-In Producer / Horizontal |
| 2019-05-03 | Administrative re-save | SABINAL ENERGY OPERATING, LLC | HARRIS (SAN ANDRES) | Producing / Horizontal |
| 2019-03-06 |
New permit 2019-03-06 Completion 2018-09-13 |
SABINAL ENERGY OPERATING, LLC | HARRIS (SAN ANDRES) | Producing / Horizontal |
| 2018-10-31 |
Initial filing Permit: 2018-10-31 Spud: 2018-07-07 Completion: 2018-08-01 |
SABINAL ENERGY OPERATING, LLC | HARRIS (SAN ANDRES) | Producing / Horizontal |