BEDNAR 189 Well Details
Texas Wells · Glasscock County · GARDEN CITY, S. (WOLFCAMP) field · LAREDO PETROLEUM, INC.
API No.
Latest Permit
Spud Date
Latest Completion
BEDNAR 189 (API 17334753) is operated by LAREDO PETROLEUM, INC. and sits in the GARDEN CITY, S. (WOLFCAMP) oil & gas field of Glasscock County, Texas.
Surface location: 32.0252, -101.2419
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (674,898 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2014-09-10 | Laredo Petroleum, Inc. | — | 9,737 | 674,898 | — |
| 2012-04-04 | Laredo Petroleum, Inc. | — | — | — | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-02-17 |
New permit 2014-10-15 Completion 2014-09-12 |
LAREDO PETROLEUM, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Vertical |
| 2014-12-04 |
New permit 2014-08-07 Completion 2013-04-05 |
LAREDO PETROLEUM, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Vertical |
| 2014-10-15 |
New permit 2014-10-15 Spudded 2012-02-23 Completion 2014-09-12 |
LAREDO PETROLEUM, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Vertical |
| 2013-11-13 |
Initial filing Permit: 2012-12-27 Completion: 2012-04-08 |
LAREDO PETROLEUM, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Vertical |