LPI-DRIVER 33-28 (ALLOC-H) Well Details
Texas Wells · Glasscock County · GARDEN CITY, S. (WOLFCAMP) field · LAREDO PETROLEUM, INC.
API No.
Latest Permit
Spud Date
Latest Completion
LPI-DRIVER 33-28 (ALLOC-H) (API 17338178) is operated by LAREDO PETROLEUM, INC. and sits in the GARDEN CITY, S. (WOLFCAMP) oil & gas field of Glasscock County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (23,447,592 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-10-20
→ 2019-10-31 |
Laredo Petroleum, Inc. | 10,152 | 7,648 | 23,447,592 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-07-29 | Administrative re-save | LAREDO PETROLEUM, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Horizontal |
| 2020-06-04 |
New permit 2020-06-04 |
LAREDO PETROLEUM, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Horizontal |
| 2020-04-24 | Administrative re-save | LAREDO PETROLEUM, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Horizontal |
| 2020-02-03 |
Initial filing Permit: 2020-02-03 Spud: 2019-08-04 Completion: 2019-11-06 |
LAREDO PETROLEUM, INC. | GARDEN CITY, S. (WOLFCAMP) | Producing / Horizontal |