BOIS DARC FENCEPOST Well Details
Texas Wells · Grayson County · SHERMAN, SOUTH (DAVIS SAND) field · SILVER SPIKE ENERGY OPER, LLC
API No.
Latest Permit
Spud Date
Latest Completion
BOIS DARC FENCEPOST (API 18131538) is operated by SILVER SPIKE ENERGY OPER, LLC and sits in the SHERMAN, SOUTH (DAVIS SAND) oil & gas field of Grayson County, Texas.
Surface location: 33.3525, -96.3856
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (0 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2013-11-06 | Silver Spike Energy | — | 10,120 | 0 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-08-05 | Field → SHERMAN, SOUTH (DAVIS SAND) | SILVER SPIKE ENERGY OPER, LLC | SHERMAN, SOUTH (DAVIS SAND) | Producing / Vertical |
| 2015-05-14 |
New permit 2015-05-14 Spudded 2013-09-14 Completion 2013-10-04 |
SILVER SPIKE ENERGY OPER, LLC | WILDCAT | Producing / Vertical |
| 2014-09-24 | Administrative re-save | SILVER SPIKE ENERGY OPER, LLC | WILDCAT | Producing / Vertical |
| 2013-12-16 |
Initial filing Permit: 2013-12-16 Completion: 2013-11-06 |
SILVER SPIKE ENERGY OPER, LLC | WILDCAT | Producing / Vertical |