REUBEN PIERCE OIL UNIT Well Details
Texas Wells · Harrison County · WASKOM (TRAVIS PEAK 1) field · SHERIDAN PRODUCTION CO III, LLC
API No.
Latest Permit
Spud Date
Latest Completion
REUBEN PIERCE OIL UNIT (API 20332146) is operated by SHERIDAN PRODUCTION CO III, LLC and sits in the WASKOM (TRAVIS PEAK 1) oil & gas field of Harrison County, Texas.
Surface location: 32.4501, -94.1329
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (36,288 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2019-09-13 | Sheridan Production Company, LLC | — | 5,994 | 18,144 | — |
| 2019-09-13 | Sheridan Production Company, LLC | — | 5,994 | 18,144 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-04-09 | Administrative re-save | SHERIDAN PRODUCTION CO III, LLC | WASKOM (TRAVIS PEAK 1) | Producing / Vertical |
| 2020-02-11 |
New permit 2020-02-11 Operator → SHERIDAN PRODUCTION CO III, LLC |
SHERIDAN PRODUCTION CO III, LLC | WASKOM (TRAVIS PEAK 1) | Producing / Vertical |
| 2019-10-03 |
Initial filing Permit: 2019-10-03 Spud: 1992-10-06 Completion: 2019-09-16 |
SHERIDAN PRODUCTION COMPANY, LLC | WASKOM (TRAVIS PEAK 1) | Producing / Vertical |