TAYLOR, W.B. Well Details
Texas Wells · Harrison County · WASKOM, (TRAVIS PEAK, UPPER) field · SHERIDAN PRODUCTION CO III, LLC
API No.
Latest Permit
Spud Date
Latest Completion
TAYLOR, W.B. (API 20332200) is operated by SHERIDAN PRODUCTION CO III, LLC and sits in the WASKOM, (TRAVIS PEAK, UPPER) oil & gas field of Harrison County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (11,380 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2021-04-14 | SHERIDAN PRODUCTION CO III, LLC | — | 6,305 | 11,380 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2021-09-09 | Administrative re-save | SHERIDAN PRODUCTION CO III, LLC | WASKOM, (TRAVIS PEAK, UPPER) | Producing / Vertical |
| 2021-08-26 |
New permit 2021-08-26 Completion 2021-07-22 Type → Producing |
SHERIDAN PRODUCTION CO III, LLC | WASKOM, (TRAVIS PEAK, UPPER) | Producing / Vertical |
| 2021-06-16 | Administrative re-save | SHERIDAN PRODUCTION CO III, LLC | WASKOM, (TRAVIS PEAK, UPPER) | Shut-In Producer / Vertical |
| 2021-06-14 |
Initial filing Permit: 2021-06-14 Spud: 1993-05-02 Completion: 2021-04-19 |
SHERIDAN PRODUCTION CO III, LLC | WASKOM, (TRAVIS PEAK, UPPER) | Shut-In Producer / Vertical |