LYONS TB C (AW) Well Details
Texas Wells · Harrison County · CARTHAGE (HAYNESVILLE SHALE) field · SABINE OIL & GAS CORPORATION
API No.
Latest Permit
Spud Date
Latest Completion
LYONS TB C (AW) (API 20335543) is operated by SABINE OIL & GAS CORPORATION and sits in the CARTHAGE (HAYNESVILLE SHALE) oil & gas field of Harrison County, Texas.
Surface location: 32.0000, -94.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (40,669,398 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-01-05
→ 2023-03-11 |
Sabine Oil & Gas Corporation | 10,926 | 11,155 | 40,669,398 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-01-05 | Administrative re-save | SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2025-12-04 |
New permit 2025-12-04 Completion 2024-08-08 |
SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2024-10-30 | Administrative re-save | SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2024-09-23 |
New permit 2024-09-23 Completion 2024-08-05 |
SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2023-07-06 | Administrative re-save | SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |
| 2023-05-31 |
Initial filing Permit: 2023-05-31 Spud: 2022-10-02 Completion: 2023-05-11 |
SABINE OIL & GAS CORPORATION | CARTHAGE (HAYNESVILLE SHALE) | Producing / Horizontal |