POWELL E UNIT Well Details
Texas Wells · Hartley County · LATHEM (CANYON GRANITE WASH) field · RIO PETROLEUM, INC.
API No.
Latest Permit
Spud Date
Latest Completion
POWELL E UNIT (API 20530174) is operated by RIO PETROLEUM, INC. and sits in the LATHEM (CANYON GRANITE WASH) oil & gas field of Hartley County, Texas.
Surface location: 35.9702, -102.4438
Update History (7 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-09-02 |
Completion 2022-04-06 |
RIO PETROLEUM, INC. | LATHEM (CANYON GRANITE WASH) | Active UIC / Vertical |
| 2022-04-22 |
New permit 2022-04-22 |
RIO PETROLEUM, INC. | LATHEM (CANYON GRANITE WASH) | Active UIC / Vertical |
| 2021-05-20 | Administrative re-save | RIO PETROLEUM, INC. | LATHEM (CANYON GRANITE WASH) | Active UIC / Vertical |
| 2021-05-19 |
New permit 2021-05-19 Type → Active UIC |
RIO PETROLEUM, INC. | LATHEM (CANYON GRANITE WASH) | Active UIC / Vertical |
| 2021-04-20 |
New permit 2021-04-20 Type → Producing |
RIO PETROLEUM, INC. | LATHEM (CANYON GRANITE WASH) | Producing / Vertical |
| 2020-09-02 |
Spudded 1986-02-15 |
RIO PETROLEUM, INC. | LATHEM (CANYON GRANITE WASH) | Active UIC / Vertical |
| 2020-08-21 |
Initial filing Permit: 2020-08-21 Spud: 2020-08-10 Completion: 2020-08-12 |
RIO PETROLEUM, INC. | LATHEM (CANYON GRANITE WASH) | Active UIC / Vertical |