ROLEY 3-8 Well Details
Texas Wells · Hockley County · ILLUSION LAKE (SAN ANDRES) field · BERYL OIL AND GAS, LP
API No.
Latest Permit
Spud Date
Latest Completion
ROLEY 3-8 (API 21937453) is operated by BERYL OIL AND GAS, LP and sits in the ILLUSION LAKE (SAN ANDRES) oil & gas field of Hockley County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (929,442 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-02-25
→ 2019-03-01 |
Reliance Energy, Inc | 5,557 | 4,700 | 929,442 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-03-10 | Administrative re-save | BERYL OIL AND GAS, LP | ILLUSION LAKE (SAN ANDRES) | Producing / Horizontal |
| 2022-01-17 |
New permit 2022-01-17 Completion 2021-11-30 Operator → BERYL OIL AND GAS, LP |
BERYL OIL AND GAS, LP | ILLUSION LAKE (SAN ANDRES) | Producing / Horizontal |
| 2019-06-07 | Administrative re-save | RELIANCE ENERGY, INC. | ILLUSION LAKE (SAN ANDRES) | Producing / Horizontal |
| 2019-04-02 |
Initial filing Permit: 2019-04-02 Spud: 2018-11-24 Completion: 2019-03-13 |
RELIANCE ENERGY, INC. | ILLUSION LAKE (SAN ANDRES) | Producing / Horizontal |