BARR 10-8 B UNIT Well Details
Texas Wells · Howard County · SPRABERRY (TREND AREA) field · HIGHPEAK ENERGY HOLDINGS, LLC
API No.
Latest Permit
Spud Date
Latest Completion
BARR 10-8 B UNIT (API 22742002) is operated by HIGHPEAK ENERGY HOLDINGS, LLC and sits in the SPRABERRY (TREND AREA) oil & gas field of Howard County, Texas.
Surface location: 32.4481, -101.2361
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (16,624,093 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-02-11
→ 2023-03-06 |
HighPeak Energy Holdings, LLC. | 10,763 | 6,079 | 16,624,093 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-04-19 |
Completion 2023-05-31 |
HIGHPEAK ENERGY HOLDINGS, LLC | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2024-01-12 |
New permit 2024-01-12 Spudded 2022-11-03 Completion 2023-06-01 Type → Producing |
HIGHPEAK ENERGY HOLDINGS, LLC | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2023-03-02 | Administrative re-save | HIGHPEAK ENERGY HOLDINGS, LLC | SPRABERRY (TREND AREA) | Shut-In Producer / Horizontal |
| 2023-01-10 |
Initial filing Permit: 2023-01-10 Spud: 2022-10-27 Completion: 2022-12-07 |
HIGHPEAK ENERGY HOLDINGS, LLC | SPRABERRY (TREND AREA) | Shut-In Producer / Horizontal |