UNIVERSITY EAST Well Details
Texas Wells · Irion County · LIN (WOLFCAMP) field · EP ENERGY E&P COMPANY, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
UNIVERSITY EAST (API 23534944) is operated by EP ENERGY E&P COMPANY, L.P. and sits in the LIN (WOLFCAMP) oil & gas field of Irion County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (6,610,968 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2012-04-10 | El Paso E&P Company | 7,732 | — | — | — |
|
2012-04-10
→ 2012-04-15 |
EP Energy | 7,732 | 6,624 | 6,610,968 | — |
Update History (3 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2014-05-07 |
New permit 2013-09-19 Operator → EP ENERGY E&P COMPANY, L.P. |
EP ENERGY E&P COMPANY, L.P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2013-03-15 |
New permit 2012-05-11 Completion 2012-04-21 Type → Producing |
EL PASO E & P COMPANY, L. P. | LIN (WOLFCAMP) | Producing / Horizontal |
| 2013-03-14 |
Initial filing Permit: 2012-04-20 Completion: 2012-04-20 |
EL PASO E & P COMPANY, L. P. | LIN (WOLFCAMP) | Shut-In Producer / Horizontal |