YANTA, EDWIN Well Details
Texas Wells · Karnes County · EAGLEVILLE (EAGLE FORD-2) field · MAGNOLIA OIL & GAS OPERATING LLC
API No.
Latest Permit
Spud Date
Latest Completion
YANTA, EDWIN (API 25535211) is operated by MAGNOLIA OIL & GAS OPERATING LLC and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of Karnes County, Texas.
Surface location: 29.0327, -97.8450
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (4,736,508 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-06-26
→ 2017-07-03 |
EnerVest, Ltd. | 2,521 | 10,660 | 4,736,508 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-08-01 | Administrative re-save | MAGNOLIA OIL & GAS OPERATING LLC | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2023-06-22 |
New permit 2023-06-22 Operator → MAGNOLIA OIL & GAS OPERATING LLC |
MAGNOLIA OIL & GAS OPERATING LLC | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2018-07-12 | Administrative re-save | ENERVEST OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2018-02-20 |
New permit 2018-02-20 |
ENERVEST OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2018-01-26 | Administrative re-save | ENERVEST OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2017-09-13 |
Initial filing Permit: 2017-09-13 Spud: 2017-03-30 Completion: 2017-07-19 |
ENERVEST OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |