SALGE-BUSSELMAN UNIT Well Details
Texas Wells · Karnes County · EAGLEVILLE (EAGLE FORD-2) field · MARATHON OIL EF LLC
API No.
Latest Permit
Spud Date
Latest Completion
SALGE-BUSSELMAN UNIT (API 25536481) is operated by MARATHON OIL EF LLC and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of Karnes County, Texas.
Surface location: 28.0000, -97.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (10,198,400 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-09-29
→ 2019-10-23 |
Marathon Oil | 6,357 | 11,830 | 10,198,400 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-05-01 |
New permit 2020-01-24 Completion 2019-12-30 |
MARATHON OIL EF LLC | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2020-02-10 |
New permit 2019-11-22 Completion 2019-11-01 |
MARATHON OIL EF LLC | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2020-01-24 |
New permit 2020-01-24 Completion 2019-12-30 Type → Producing |
MARATHON OIL EF LLC | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2020-01-15 |
New permit 2019-10-11 Completion 2019-08-31 Type → Shut-In Producer |
MARATHON OIL EF LLC | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |
| 2019-11-22 |
New permit 2019-11-22 Spudded 2019-07-16 Completion 2019-11-01 Type → Producing |
MARATHON OIL EF LLC | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2019-10-11 |
Initial filing Permit: 2019-10-11 Spud: 2016-07-16 Completion: 2019-08-31 |
MARATHON OIL EF LLC | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |