ARCH Well Details
Texas Wells · Karnes County · EAGLEVILLE (EAGLE FORD-2) field · TIDAL PETROLEUM, INC.
API No.
Latest Permit
Spud Date
Latest Completion
ARCH (API 25536713) is operated by TIDAL PETROLEUM, INC. and sits in the EAGLEVILLE (EAGLE FORD-2) oil & gas field of Karnes County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (4,855,032 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2020-01-27
→ 2020-01-31 |
Tidal Petroleum, Inc. | 2,851 | 12,112 | 4,855,032 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-06-23 |
New permit 2020-05-12 Type → Producing |
TIDAL PETROLEUM, INC. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2020-06-02 |
New permit 2020-02-20 Type → Shut-In Producer |
TIDAL PETROLEUM, INC. | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |
| 2020-05-12 |
New permit 2020-05-12 |
TIDAL PETROLEUM, INC. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2020-02-20 |
Initial filing Permit: 2020-02-20 Spud: 2019-11-30 Completion: 2020-02-16 |
TIDAL PETROLEUM, INC. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |