KENEDY, JOHN G. JR. C Well Details
Texas Wells · Kenedy County · EL PAISTLE, DEEP (FRIO) field · HEADINGTON ENERGY PARTNERS, LLC
API No.
Latest Permit
Spud Date
Latest Completion
KENEDY, JOHN G. JR. C (API 26131599) is operated by HEADINGTON ENERGY PARTNERS, LLC and sits in the EL PAISTLE, DEEP (FRIO) oil & gas field of Kenedy County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (163,933 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2019-04-03 | Headington Energy Partners, LLC | — | 13,890 | 163,933 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2021-06-11 | Administrative re-save | HEADINGTON ENERGY PARTNERS, LLC | EL PAISTLE, DEEP (FRIO) | Producing / Directional |
| 2021-05-14 |
New permit 2021-05-14 Completion 2020-11-23 |
HEADINGTON ENERGY PARTNERS, LLC | EL PAISTLE, DEEP (FRIO) | Producing / Directional |
| 2019-06-13 | Administrative re-save | HEADINGTON ENERGY PARTNERS, LLC | EL PAISTLE, DEEP (FRIO) | Producing / Directional |
| 2019-05-01 |
Initial filing Permit: 2019-05-01 Spud: 2018-11-24 Completion: 2019-04-03 |
HEADINGTON ENERGY PARTNERS, LLC | EL PAISTLE, DEEP (FRIO) | Producing / Directional |