CHALOS ABRAS GU A Well Details
Texas Wells · La Salle County · HAWKVILLE (EAGLEFORD SHALE) field · LEWIS PETRO PROPERTIES, INC.
API No.
Latest Permit
Spud Date
Latest Completion
CHALOS ABRAS GU A (API 28335642) is operated by LEWIS PETRO PROPERTIES, INC. and sits in the HAWKVILLE (EAGLEFORD SHALE) oil & gas field of La Salle County, Texas.
Surface location: 28.0000, -99.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (14,584,542 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2016-05-22
→ 2016-06-01 |
Lewis Energy Group | 7,108 | 11,021 | 14,584,542 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-04-16 | Administrative re-save | LEWIS PETRO PROPERTIES, INC. | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2025-02-05 |
New permit 2025-02-05 Completion 2025-01-31 |
LEWIS PETRO PROPERTIES, INC. | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2016-08-31 | Administrative re-save | LEWIS PETRO PROPERTIES, INC. | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2016-08-24 |
New permit 2016-08-24 Completion 2016-08-23 |
LEWIS PETRO PROPERTIES, INC. | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2016-08-11 | Administrative re-save | LEWIS PETRO PROPERTIES, INC. | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2016-07-19 |
Initial filing Permit: 2016-07-19 Spud: 2016-02-21 Completion: 2016-06-10 |
LEWIS PETRO PROPERTIES, INC. | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |