LLOYD HURT AC-C Well Details
Texas Wells · La Salle County · LORENZO (AUSTIN CHALK) field · MATADOR PRODUCTION COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
LLOYD HURT AC-C (API 28336575) is operated by MATADOR PRODUCTION COMPANY and sits in the LORENZO (AUSTIN CHALK) oil & gas field of La Salle County, Texas.
Surface location: 28.0000, -99.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (15,079,129 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-02-11
→ 2019-03-05 |
Matador Production Company | 8,923 | 7,197 | 15,079,129 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-12-10 | Administrative re-save | MATADOR PRODUCTION COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2019-10-21 |
Initial filing Permit: 2019-10-21 Spud: 2018-12-04 Completion: 2019-03-23 |
MATADOR PRODUCTION COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |